Launch ceremony for the deployment of a 1.8MWP solar project
On August 28, DAT Solar and Nam Do Group organized a launch ceremony for the deployment of 41 solar energy systems with a total capacity of 1.8MWp in Ho Chi Minh City. This large-scale rooftop solar project is the result of collaboration between DAT Solar and its strategic partner.
Strength in Partnership
In its long-term development strategy, DAT Solar aims to strengthen partnerships with its collaborators to expand the reach of high-quality solar energy systems to residents and businesses in Vietnam. Currently, DAT Solar and its partners nationwide have successfully implemented various solar projects, including systems for domestic private enterprises, state-owned enterprises, and 100% foreign-owned enterprises (FDI).
Leveraging Nam Do Group’s experience in executing large electromechanical contracts and DAT Solar’s expertise in optimizing large solar power systems, combined with superior products from reputable global brands, the collaboration received complete trust from the Ho Chi Minh City Power Corporation. The Corporation has high standards for design, optimal engineering, and product quality. This is the reason why Nam Do Group and DAT Solar formed a strong partnership. Currently, DAT Solar is expanding this cooperation model with its other partners.
Bringing Efficiency to All Parties
Through this collaborative model, DAT Solar and its partners can more easily convince their customers, providing DAT Solar with more opportunities to replicate high-quality solar energy systems nationwide. For this strategy to bring sustainable benefits, the quality and efficiency of the solar power systems are crucial factors.
Only when the solar power system brings high economic efficiency to the investor does the credibility of DAT Solar and DAT Solar itself get strengthened in the long run. Thanks to this, it becomes easier to participate in bidding for new projects. In some cases, existing customers actively introduce new customers to DAT Solar and its partners. To gain this trust, in addition to the strengths and experiences in each field of both parties, the product system, especially the super conversion team consisting of Canadian Solar panels and INVT inverters, plays a crucial role. Alongside this, specialized optimization techniques in both design and system deployment also contribute significantly to increasing customer confidence.
The simultaneous execution of 41 projects faced no obstacles
Although the 1.8MWp project is simultaneously implemented at 41 different locations, the construction process encounters no obstacles. DAT employs 350 personnel, with 41% being engineers. Thanks to a large team of well-trained and experienced engineers in surveying, design, construction supervision, and testing, all 41 projects are meticulously prepared with consistent quality, despite the substantial workload happening concurrently. This aspect provides a sense of assurance for partners collaborating with DAT Solar.
With a warehouse inventory always exceeding 10MWp, DAT Solar is ready and willing to expand solar energy systems alongside its partners, bringing them to businesses nationwide.